Transylvania University students clear Brighton East Rail Trail Royal Troon connector (Aug.2010) 
transpixel
transpixel No Caption transpixel
transpixel
transpixel
transpixel No Caption transpixel
transpixel
transpixel
transpixel The Royal Troon Greenway connector after the cleanup. The footpath to the right leads to the Brighton East rail Trail. transpixel
transpixel
[800x600] [4000x3000][800x634] [1280x1014][800x600] [4000x3000]
Viewed: 608 times.
Viewed: 596 times.
The Royal Troon Greenway connector after the cleanup. The footpath to the right leads to the Brighton East rail Trail.
Viewed: 598 times.
transpixel
transpixel What a difference a brush clearing makes! The interstate is now visable after the cleanup. transpixel
transpixel
transpixel
transpixel The future access to Pleasant Ridge Park and the Brighton East Rail Trail is now visable after the cleanup. transpixel
transpixel
transpixel
transpixel No Caption transpixel
transpixel
[800x600] [4000x3000][800x600] [4000x3000][800x600] [4000x3000]
What a difference a brush clearing makes! The interstate is now visable after the cleanup.
Viewed: 593 times.
The future access to Pleasant Ridge Park and the Brighton East Rail Trail is now visable after the cleanup.
Viewed: 633 times.
Viewed: 621 times.
transpixel
transpixel The footpath to the left leads to the Royal Troon Greenway connector and the clearing to the right is the future extension of the Brighton East Rail Trail. transpixel
transpixel
transpixel
transpixel Royal Troon Greenway connector. transpixel
transpixel
transpixel
transpixel No Caption transpixel
transpixel
[800x600] [4000x3000][800x600] [4000x3000][800x600] [4000x3000]
The footpath to the left leads to the Royal Troon Greenway connector and the clearing to the right is the future extension of the Brighton East Rail Trail.
Viewed: 602 times.
Royal Troon Greenway connector.
Viewed: 626 times.
Viewed: 690 times.
Powered by Gallery v1.4.4-pl6 RSS

P.O. Box 597 • Lexington, Kentucky • 40588-0597

HOME | NEWS