Transylvania University students clear Brighton East Rail Trail Royal Troon connector (Aug.2010)
55 images in this album on 7 pages
[slideshow]
[login]
Gallery:
Rail-Trailer Photo Club
 
1
 
2
 
3
 
4
 
5
 
6
 
7
[800x600]
[4000x3000]
[800x634]
[1280x1014]
[800x600]
[4000x3000]
Viewed: 608 times.
Viewed: 596 times.
The Royal Troon Greenway connector after the cleanup. The footpath to the right leads to the Brighton East rail Trail.
Viewed: 598 times.
[800x600]
[4000x3000]
[800x600]
[4000x3000]
[800x600]
[4000x3000]
What a difference a brush clearing makes! The interstate is now visable after the cleanup.
Viewed: 593 times.
The future access to Pleasant Ridge Park and the Brighton East Rail Trail is now visable after the cleanup.
Viewed: 633 times.
Viewed: 621 times.
[800x600]
[4000x3000]
[800x600]
[4000x3000]
[800x600]
[4000x3000]
The footpath to the left leads to the Royal Troon Greenway connector and the clearing to the right is the future extension of the Brighton East Rail Trail.
Viewed: 602 times.
Royal Troon Greenway connector.
Viewed: 626 times.
Viewed: 690 times.
 
1
 
2
 
3
 
4
 
5
 
6
 
7
Gallery:
Rail-Trailer Photo Club
Powered by
Gallery
v1.4.4-pl6
RSS
P.O. Box 597 • Lexington, Kentucky • 40588-0597
HOME
|
NEWS