<?xml version="1.0" encoding="ISO-8859-1"?>
<rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:photo="http://www.pheed.com/pheed/" xmlns:pb="http://snaplog.com/backend/PhotoBlog.html">
	<channel>
		<title>Rail-Trailer Photo Club</title>
		<link>http://www.kyrailtrail.org/gallery</link>
		<description>903 photos in 59 albums</description>
		<language>en-US</language>
		<lastBuildDate>Thu, 15 May 2008 09:32:16 -0400</lastBuildDate>
		<managingEditor>trailing@kyrailtrail.org</managingEditor>
		<webMaster>trailing@kyrailtrail.org</webMaster>
		<generator>Gallery 1.4.4-pl6, http://gallery.menalto.com/</generator>
		<docs>http://blogs.law.harvard.edu/tech/rss</docs>
		<ttl>40</ttl>
		<image>
			<title>Rail-Trailer Photo Club</title>
			<url>http://www.kyrailtrail.org/gallery/albums/Working-on-the-Mammoth-Cave-RT/Mc_1_03_05.thumb.jpg</url>
			<link>http://www.kyrailtrail.org/gallery</link>
			<width>144</width>
			<height>150</height>
		</image>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Working-on-the-Mammoth-Cave-RT</link>
			<guid isPermaLink="false">a867ce9a16f69f1ebe349cce750ef5da</guid>
			<title> Mammoth Cave Bike and Hike Trail - 9 miles</title>
			<pubDate>Sun, 11 May 2008 16:40:26 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Working-on-the-Mammoth-Cave-RT</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Working-on-the-Mammoth-Cave-RT/Mc_1_03_05.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Working-on-the-Mammoth-Cave-RT/Mc_1_03_05.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Working-on-the-Mammoth-Cave-RT/Mc_1_03_05.thumb.jpg</pb:thumb>
			<description>The nine mile trail runs from the park headquarters to the park boundary over much of the old Mammoth Cave Railroad and then connects to the one mile Park City bike trail and ends at historic Bell's Tavern. Surface is crushed gravel.    The Mammoth Cave Railroad carried passengers and freight between the main L&amp;N line at Park City, Kentucky and Mammoth Cave from the 1880s until about 1930. About 40% of the grade was obliterated by highway construction in the 1960s. Engine #4 and a combination coach are displayed at the original terminus.   Funding provided by the National Park Service and a grant from the National park Concessions. Volunteers did the ground work of trimming and making a wide path. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/album04</link>
			<guid isPermaLink="false">19467d5737c5c4848c20510f7e4eca17</guid>
			<title>Stone House Trail in Camp Springs, KY 08/20/2005</title>
			<pubDate>Sun, 11 May 2008 16:40:26 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=album04</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/album04/Camp_Springs_Fire_Station.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/album04/Camp_Springs_Fire_Station.jpg</photo:thumbnail>
			<pb:thumb height="106" width="144">http://www.kyrailtrail.org/gallery/albums/album04/Camp_Springs_Fire_Station.thumb.jpg</pb:thumb>
			<description>The residents of Camp Springs plan to build a 30-mile trail for bicycling, walking, and jogging. It will connect Camp Springs with Silver Grove and Melbourne.  Camp Springs is in northern Campbell County about 3.5 miles from the Ohio River, and 15 miles from downtown Cincinnati. It is one of the very few undeveloped parts of Campbell County, and the residents are strongly committed to keeping their rural community rural. The trail will give them easy access to a safe place to exercise, recreate, and possibly, commute. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/2008relay</link>
			<guid isPermaLink="false">05a7c5a34ddcc0d370479c4a0fed6dae</guid>
			<title>Plans for the 2008 Cycling Relay Ashland to Lexington</title>
			<pubDate>Wed,  7 May 2008 18:33:20 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=2008relay</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/2008relay/Bike_relay_draft.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/2008relay/Bike_relay_draft.sized.jpg</photo:thumbnail>
			<pb:thumb height="200" width="130">http://www.kyrailtrail.org/gallery/albums/2008relay/Bike_relay_draft.thumb.jpg</pb:thumb>
			<description>Details for the 2008 Cycling Relay between Ashland and Lexington are in links on the homepage of the KRTC website. This is a National Trail Day Event on Saturday, May 31st, 2008. The ride is to promote the development of multi-use trails throughout the state and specifically the creation of a continuous railtrail over the abandoned 106 mile CSX railroad corridor  between Lexington and Ashland.  The relay will follow county roads close to the corridor and in a few places be on the corridor or adjacent to it. The relay will start at 7 AM at Princess in Boyd County and end at Pleasant Ridge Park, 1350 Pleasant Ridge Drive in eastern Fayette County.  The distance of the cycling relay is 133 miles and  can be completed with a road bike.   Greeters and support people will be needed along the route.  If you want to volunteer or help sponsor the ride please contact Dixie Moore at dixiemoore@insightbb.com. Volunteers who sag will be reimbursed for gas mileage. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Cadiz-Trigg-County</link>
			<guid isPermaLink="false">28d662586044bbff7d60ffce3e91a0a6</guid>
			<title>Cadiz/Trigg County</title>
			<pubDate>Wed,  7 May 2008 15:14:21 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Cadiz-Trigg-County</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Cadiz-Trigg-County/Trail_End.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Cadiz-Trigg-County/Trail_End.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Cadiz-Trigg-County/Trail_End.thumb.jpg</pb:thumb>
			<description></description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/redbud2008</link>
			<guid isPermaLink="false">fcd696f52a37b6bf0412bd58ef134a64</guid>
			<title>Redbud Ride, April 19th, 2008</title>
			<pubDate>Fri, 25 Apr 2008 06:44:28 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=redbud2008</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/redbud2008/magoffin_redbud_9_10_copy.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/redbud2008/magoffin_redbud_9_10_copy.sized.jpg</photo:thumbnail>
			<pb:thumb height="134" width="144">http://www.kyrailtrail.org/gallery/albums/redbud2008/magoffin_redbud_9_10_copy.thumb.jpg</pb:thumb>
			<description>The first annual Magoffin County Redbud Horseback Ride was held at the farm of Mark Minix on Saturday, April 19,2008 on the Right Fork of the Oakley.  The ride was organized by local horseback riders to show the feasibility of using the railroad corridor  being abandoned by R.J. Corman in Breathitt, Johnson and Magoffin Counties to create the Big Lovely Mountain Trail  as a multi use non motorized trail. By all accounts, the ride went extremely well with over 100 riders in attendance.  </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/winchestertrail</link>
			<guid isPermaLink="false">41f5eed863061c6490c6e822293c2f91</guid>
			<title>Winchester Traveling Trail Dedication, 4/9/08</title>
			<pubDate>Thu, 10 Apr 2008 21:06:04 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=winchestertrail</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/winchestertrail/2008_04_09_0018.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/winchestertrail/2008_04_09_0018.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/winchestertrail/2008_04_09_0018.thumb.jpg</pb:thumb>
			<description>The Winchester Traveling Trail was dedicated April  9th at the corner of Colby Road and the Bypass on commercial property owned by Clark Medical Center.  The inaugural walk was lead by First Lady Jane Beshear. The mowed 2.5-mile trail will stay in its proposed location for at least a year. The project is a collaborative effort between the Clark Co. Activity Coalition, Bluegrass Rails to Trails and the following sponsors: Clark Regional Medical Center, Clark Co. Health Dept., Ertel Medicine &amp; Pediatrics, Graves &amp; Dean Construction, the Allen Company, Bypass Rental, Boonesboro Animal Clinic, Winchester/Clark Co. Parks &amp; Rec, City of Winchester, Winchester Municipal  Utilities and Clark Energy Cooperative.  see www.travelingtrail.org</description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Meeting-03-05</link>
			<guid isPermaLink="false">3255a144694072bf8a027f91e38ede23</guid>
			<title>KY Rails to Trails Council Meetings and Open Houses, 2004-2007</title>
			<pubDate>Tue,  8 Apr 2008 15:12:03 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Meeting-03-05</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Meeting-03-05/03_2.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Meeting-03-05/03_2.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Meeting-03-05/03_2.thumb.jpg</pb:thumb>
			<description>Council Meetings are held monthly in downtown Lexington.  Thanks to LFUCG for making meeting rooms available. For the past several years KRTC has an open house for members and supporters in December. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/relay</link>
			<guid isPermaLink="false">f85dad0a934eb7e42cf2166cb79b0bea</guid>
			<title>Lexington Ashland Relay, 2005,2006,2007</title>
			<pubDate>Tue,  8 Apr 2008 14:25:54 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=relay</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.thumb.jpg</pb:thumb>
			<description>Contains albums of the relays from 2005, 2006 and 2007.</description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/album08</link>
			<guid isPermaLink="false">d765d9cc92f7bff07bfb921415bf2f84</guid>
			<title>Lexington Big Sandy Bike Relay, June 9, 2007 (Keith Lovan) </title>
			<pubDate>Tue,  8 Apr 2008 14:24:04 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=album08</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/album08/07_06_09_LBS_001_sized.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/album08/07_06_09_LBS_001_sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/album08/07_06_09_LBS_001_sized.thumb.jpg</pb:thumb>
			<description>The 3rd annual relay was a huge success. Riders left Lexington at 8:00 AM and arrived in Boyd Co. at 6:30 PM. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/2006-Lexington-to-Ashland-Cycling-Relay</link>
			<guid isPermaLink="false">af3ecc9dbc5246dd94a845ccc2140940</guid>
			<title>2006 Lexington to Ashland Cycling Relay</title>
			<pubDate>Tue,  8 Apr 2008 14:06:31 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=2006-Lexington-to-Ashland-Cycling-Relay</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/2006-Lexington-to-Ashland-Cycling-Relay/Copy_of_DSCF0948.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/2006-Lexington-to-Ashland-Cycling-Relay/Copy_of_DSCF0948.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/2006-Lexington-to-Ashland-Cycling-Relay/Copy_of_DSCF0948.thumb.jpg</pb:thumb>
			<description>On July 22/2006 45 cyclists participated in the Cycling Relay from Winchester to Rush on county roads along the old CSX corridor.  The relay is 130 miles and followed county roads closest to the corridor and in a few places was on the 105 mile long abandoned corridor. The ride start was changed to Winchester at 9:30 AM instead of from Lexington because of rain at 8 AM.  Three riders did ride from Lexington to Winchester.  The riders on the  first leg were asked to turn back a third of the way between Winchester and Mt. Sterling because of heavy rain, however three riders chose to go on to Mt.Sterling to complete the leg; two because they had left their vehicles in  Mt. Sterling and had to get to them. It cleared up almost as soon as the  first group started to head back and we have clear but cloudly weather  the rest of the way. The relay made it to Rush by 7 pm.  The relay had two incidents, one flat tire and one rider had to take the ditch due to  inconsiderate driving. The relay was planned to meet up with the Eastern Hill Saddle Club St. Jude Ride along the old corridor east of Olive Hill. The proposed railtrail would be capable of being used by bicycles, horses and walkers. Thanks to the riders and all the support people. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/relay-06-11-05</link>
			<guid isPermaLink="false">027641d8973ea201f4c5a8a8c3d28372</guid>
			<title>2005 Lexington to Ashland Relay </title>
			<pubDate>Tue,  8 Apr 2008 14:05:54 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=relay-06-11-05</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/relay-06-11-05/DSCF0625.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/relay-06-11-05/DSCF0625.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/relay-06-11-05/DSCF0625.thumb.jpg</pb:thumb>
			<description>The Kentucky Rails to Trails Council hosted a  bicycle relay ride from Lexington to Ashland as a National Trail Day Activity on June 11, 2005.  The purpose of the ride was to promote the development of the abandoned CSX railway between Lexington and Ashland into a continuous railtrail.  The relay started at the Pleasant Ridge Park in Fayette County (approximate mile post 637.1) and ended at mile post 532.8 in Rush, one mile from the Boyd County line. The distance over the railroad corridor is 105 miles. The estimated distance of the cycling relay over nearby county and state roads was 130 miles. 30 riders took part as well as an equal number of support people. Local ham radio clubs provided coverage for most of the ride. The relay was done at an average pace of 15-17 mph on paved roads and 12 mph in eastern Carter County where sections of road closest to the corridor are unpaved. The first riders left Lexington at 8:00 AM. and the last riders arrived in Rush at 7: 15 PM.  The first 2/3s of the ride was done in intermittent drizzle and light rain. Thanks to all who may the ride safe and a success. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/relay2007</link>
			<guid isPermaLink="false">941d69d20cd44d2c7a67acc98a0960b2</guid>
			<title>2007 Lexington to Ashland Cycling Relay, June 9th, Saturday, 2007</title>
			<pubDate>Tue,  8 Apr 2008 14:04:21 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=relay2007</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/relay2007/070609_0726_35.thumb.jpg</pb:thumb>
			<description>The third Lexington to Ashland Cycling relay to promote the building of the Lexington Big Sandy Railtrail and other multi use trails in the state was a successful and safe event.   The relay started at Pleasant Ridge Park in Lexington at 8 AM and finished at Rush/Coalton/Princess at 6:30 PM just inside the Boyd County line.  The relay distance was 128 miles on county roads that paralleled the 109 miles of abandoned CSX right of way.  There were 69 cyclists that participated in the relay. Riders were from Ashland, Berea, Cincinnati, Flemingsburg, Frankfort, Georgetown, Lexington, Mount Sterling, Morehead, Nicholasville, Paris, Richmond and Winchester. In all 2,800 miles were ridden by the cyclists up and down the corridor. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/clearcreek</link>
			<guid isPermaLink="false">31ac3af01303ee71b866e8194f8cac35</guid>
			<title>Clear Creek Hollow Rail Trail</title>
			<pubDate>Tue,  8 Apr 2008 13:54:44 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=clearcreek</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/clearcreek/2006_10_22_004.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/clearcreek/2006_10_22_004.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/clearcreek/2006_10_22_004.thumb.jpg</pb:thumb>
			<description>Bell County: It traverses through Clear Creek Baptist Bible College Campus a section of the Kentucky Ridge State Forest for about 1.6 miles. This is adjacent to Pine Mountain State Resort Park. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Brighton-East-Rail-Trail-Construction</link>
			<guid isPermaLink="false">291229f110c9a29c52f30751b77924fe</guid>
			<title>Brighton East Rail Trail Construction</title>
			<pubDate>Tue,  8 Apr 2008 13:53:32 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Brighton-East-Rail-Trail-Construction</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Brighton-East-Rail-Trail-Construction/MVC_001S.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Brighton-East-Rail-Trail-Construction/MVC_001S.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Brighton-East-Rail-Trail-Construction/MVC_001S.thumb.jpg</pb:thumb>
			<description>Construction has started on the Brighton East Rail Trail. This first section will be 1 mile long and will go from Bryant Road to Pleasant Ridge Drive. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Brighton-East-Railtrail</link>
			<guid isPermaLink="false">df52a5b2d997e671f2ee5a4720867797</guid>
			<title>Brighton East Rail Trail, Lexington Ky</title>
			<pubDate>Tue,  8 Apr 2008 13:49:33 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Brighton-East-Railtrail</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.sized.jpg</photo:thumbnail>
			<pb:thumb height="124" width="144">http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.thumb.jpg</pb:thumb>
			<description></description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/BERT-clean-up-2008-03-22</link>
			<guid isPermaLink="false">06b6a913372060df10f60631369d4ff5</guid>
			<title>Clean up day on the Brighton East Rail Trail </title>
			<pubDate>Tue,  8 Apr 2008 13:49:33 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=BERT-clean-up-2008-03-22</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.sized.jpg</photo:thumbnail>
			<pb:thumb height="124" width="144">http://www.kyrailtrail.org/gallery/albums/BERT-clean-up-2008-03-22/2008_03_22_0001_edited_1.thumb.jpg</pb:thumb>
			<description>Clean up Day for the Brighton East RT in Fayette County, Saturday, March 22th.   There are several large stands of invasive honeysuckle on the one mile section. 12 Volunteers worked from 10 AM to 1PM and cleared a wide shoulder near Bryant Road of  honeysuckle on an overcast day at 40 degrees. A hearty thanks to the volunteers. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Signs-and-other-trail-elements</link>
			<guid isPermaLink="false">e6506caa6ad43caefae609db4af61ad3</guid>
			<title>Signs, crossings, bridges and other trail elements</title>
			<pubDate>Mon,  7 Apr 2008 15:01:47 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Signs-and-other-trail-elements</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Signs-and-other-trail-elements/DSCF1371.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Signs-and-other-trail-elements/DSCF1371.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Signs-and-other-trail-elements/DSCF1371.thumb.jpg</pb:thumb>
			<description></description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/July-4-2004-Lex</link>
			<guid isPermaLink="false">963a81f3353400dc0d763ccf53b84104</guid>
			<title>Booths, Festivals &amp; Events</title>
			<pubDate>Tue, 25 Mar 2008 09:52:29 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=July-4-2004-Lex</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/July-4-2004-Lex/MVC_625F.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/July-4-2004-Lex/MVC_625F.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/July-4-2004-Lex/MVC_625F.thumb.jpg</pb:thumb>
			<description>Pictures of booths, parades and festivals where Ky Rails to Trails has had a presence </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/C-O-Towpath-Capital-Crescent-Trail%2C-Washington%2C-DC</link>
			<guid isPermaLink="false">a64cd41589078f62fab14e48a1961eaf</guid>
			<title>C &amp; O Towpath/ Capital Crescent Trail, Washington DC</title>
			<pubDate>Sun, 17 Feb 2008 15:43:21 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=C-O-Towpath-Capital-Crescent-Trail,-Washington,-DC</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/C-O-Towpath-Capital-Crescent-Trail%2C-Washington%2C-DC/C_O_Towpath_and_Capitol_Crescent_Trail_02.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/C-O-Towpath-Capital-Crescent-Trail%2C-Washington%2C-DC/C_O_Towpath_and_Capitol_Crescent_Trail_02.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/C-O-Towpath-Capital-Crescent-Trail%2C-Washington%2C-DC/C_O_Towpath_and_Capitol_Crescent_Trail_02.thumb.jpg</pb:thumb>
			<description>The C &amp; O Towpath goes from Washington DC to Cumberland Maryland to meet the Great Allegheny Passage trail. The Capital Crescent is asphalt from Georgetown to Bethesda, MD and gravel to Silver Spring</description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Chief-Ladiga-Trail%2C-July-3-2006</link>
			<guid isPermaLink="false">1e72650cd1daf41688a43b7d446e3a4a</guid>
			<title>Chief Ladiga Trail, Alabama, July 3, 2006</title>
			<pubDate>Fri, 15 Feb 2008 20:21:00 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Chief-Ladiga-Trail,-July-3-2006</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Chief-Ladiga-Trail%2C-July-3-2006/Chief_Ladiga_Trail_02.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Chief-Ladiga-Trail%2C-July-3-2006/Chief_Ladiga_Trail_02.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Chief-Ladiga-Trail%2C-July-3-2006/Chief_Ladiga_Trail_02.thumb.jpg</pb:thumb>
			<description>This trail goes from Anniston, Alabama, to the Georgia line, connecting to the Silver comet Trail- or at least it soon will.</description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/TBRC</link>
			<guid isPermaLink="false">e8df47d4c995081383a12ddcd2528b2e</guid>
			<title>Tyrone Bridge and Railtrail Company, Young's High Bridge</title>
			<pubDate>Sun,  3 Feb 2008 10:59:08 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=TBRC</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/TBRC/cdar_bridge.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/TBRC/cdar_bridge.jpg</photo:thumbnail>
			<pb:thumb height="100" width="144">http://www.kyrailtrail.org/gallery/albums/TBRC/cdar_bridge.thumb.jpg</pb:thumb>
			<description>This project is a 2.8 mile  corridor owned by Norfolk Southern that goes from Lawrenceburg near the glass recyling plant to the Wild Turkey distillery and includes Young's High Bridge across the Kentucky River. The unique and historic Bennett H. Young Bridge would be tallest rail trial bridge in the nation. The bridge is 1659 feet in length, 283 feet above the low water mark and has a 551 ft. long cantilevered span.  The bridge and corridor is listed on the National Registry of Historic Places. The corridor is currently railbanked.  More information  in vol 7, no 1, January 2004 Trail Time, http://www.kyrailtrail.org/news.php. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Bob-Amos-Trail</link>
			<guid isPermaLink="false">0e3a582ba1e2f11616d6b82442de5cf3</guid>
			<title>Bob Amos Trail in Pike County</title>
			<pubDate>Wed, 19 Dec 2007 17:23:25 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Bob-Amos-Trail</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Bob-Amos-Trail/millard2_1.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Bob-Amos-Trail/millard2_1.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Bob-Amos-Trail/millard2_1.thumb.jpg</pb:thumb>
			<description>This is a trail in Pike County located on a reclaimed strip mine. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/Dawkins-Public-Meetings-Nov-14-15-2007</link>
			<guid isPermaLink="false">2bf269f5d82f68bea8b4541879b6dd73</guid>
			<title>Public Meetings on the Dawkins Line, Nov 14 &amp; 15</title>
			<pubDate>Sat, 17 Nov 2007 17:00:54 -0500</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=Dawkins-Public-Meetings-Nov-14-15-2007</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/Dawkins-Public-Meetings-Nov-14-15-2007/Before_the_meeting.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/Dawkins-Public-Meetings-Nov-14-15-2007/Before_the_meeting.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/Dawkins-Public-Meetings-Nov-14-15-2007/Before_the_meeting.thumb.jpg</pb:thumb>
			<description>Two public meetings were held on 11/14/2007 and 11/15/2007 at the Recreation Center in Paintsville and at the Lloyd M. Hall Community Center in Saylersville. The Big Sandy Area Development District held the meetings to give information and to get public input on the proposed rail trail project along the Dawkins Line in Johnson, Magoffin and Breathitt Counties. Several RT supporters from the cycling, hiking and horseback riding community attended the meetings. Information was provided, many questions were asked and opinions both for and against the creation the trail were expressed.         The 36 mile ROW owned by R.J. Corman that is railbanked starts at Evanston in Breathitt County, runs south of Salyersville in Magoffin County and ends at West Van Lear in Johnson County near Paintsville.  More information about the trail can be found in the January and April 2005 newsletters , vol 8. no 1 &amp; 2. http://www.kyrailtrail.org/news.php. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/railtrails-in-KY</link>
			<guid isPermaLink="false">3dcf52e399bc16e05027351bd8368aaf</guid>
			<title>Pictures of Completed Railtrail Sections in KY</title>
			<pubDate>Wed,  3 Oct 2007 19:10:10 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=railtrails-in-KY</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/railtrails-in-KY/mom_daughters.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/railtrails-in-KY/mom_daughters.sized.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/railtrails-in-KY/mom_daughters.thumb.jpg</pb:thumb>
			<description>Pictures of completed sections of railtrails in Kentucky. Many of these sections are part of larger planned multi-use trails.  See the section under &quot;Trails and Greenways&quot; for more information about individual trails. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/album06</link>
			<guid isPermaLink="false">d82d52638756efd75bb0ccb3c9670a06</guid>
			<title>Great Miami River Trail    Dayton, OH</title>
			<pubDate>Thu, 26 Jul 2007 20:01:10 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=album06</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/album06/Along_Great_Miami_River_North_of_Rice_Field.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/album06/Along_Great_Miami_River_North_of_Rice_Field.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/album06/Along_Great_Miami_River_North_of_Rice_Field.thumb.jpg</pb:thumb>
			<description>This is commonly called the River Corridor Bikeway; 22.6 miles in length.  It is not a rail-trail, but an inner city bikeway along a waterway.  I first rode this in 2000 and was pleasantly surprised.  It has hardly any elevation changes, and very few routes on roadways.I took these pictures in early November 2005 and May 2006. </description>
		</item>
		<item>
			<link>http://www.kyrailtrail.org/gallery/album11</link>
			<guid isPermaLink="false">fb27938ffbb22408f892abf5ab34dc1b</guid>
			<title>Piqua City Linear Park/Rivers Edge Section/Hydraulic Canal Path</title>
			<pubDate>Mon, 25 Jun 2007 19:38:37 -0400</pubDate>
			<comments>http://www.kyrailtrail.org/gallery/view_comments.php?set_albumName=album11</comments>
			<photo:imgsrc>http://www.kyrailtrail.org/gallery/albums/album11/East_Trailhead.thumb.jpg</photo:imgsrc>
			<photo:thumbnail>http://www.kyrailtrail.org/gallery/albums/album11/East_Trailhead.jpg</photo:thumbnail>
			<pb:thumb height="150" width="144">http://www.kyrailtrail.org/gallery/albums/album11/East_Trailhead.thumb.jpg</pb:thumb>
			<description>March 2007. These three trails make up an 11 mile triangle loop in Piqua, OH, 30 miles north of Dayton. The Linear Park section goes East-West 5.5 miles; 2.3 miles into Downtown, and another 3.2 miles, past French Park and the Hydraulic Canal Path, to its West terminus.  The Hydraulic Canal Path goes along a former man-made canal, with remains of its locks. The Rivers Edge Section starts under the Downtown bridge over the Great Miami River and heads Northwest along the river.</description>
		</item>
	</channel>
</rss>
